References

Project

Star Meadows Park
Flatiron Meadow Blvd
Erie

Owner

Town of Erie
Farrell Buller
(303) 926-2792

645 Holbrook St
Erie CO 80516

Architect

Design Concepts CLA,Inc.
Shanen Weber
(303) 664-5301
211 N. Public Rd. 100
Lafayette CO 80026

Contract Amount
$2,095,859.50

Completion
04/15/2018

A new 8 acre park for the Town of Erie will have the residence enjoying all types of activities. A big grass area and basketball court for sports and custom playgrounds for the kids. The town decided to make this park special by designing custom play pieces and custom shelters complimented with colored pattern concrete and a solar summit climbing hill with an engraved sun dial at the top. Other features include a stainless steel sphere, slackline balance cable and to top off these exciting features fiber optic lights will shine through the concrete in a radiating pattern.

Project

Colfax & Lipan Improvements
Colfax & LIpan Intersection
Denver

Owner

City & County of Denver-PW
John LaSala
(720) 913-4534
201 W. Colfax Ave.
Denver CO 80202

Architect

Felsburg, Holt, Ullevig
6300 S Syracuse Way #600
Centennial, CO 80111

Contract Amount
$1,636,145.93

Completion
03/01/2018

To continue Denver's entryway to downtown the unique medians that were installed between Speer Blvd. and Broadway will continue west to Mariposa Street. New medians will be installed in these two blocks including traffic signal adjustments, intersection and bus lane improvements and new landscape and irrigation.

Project

Boulder Playgrounds
3 Locations
Boulder

Owner

City of Boulder
Mike Lamb
(303) 413-7225
Parks & Recreation
Boulder CO 80304-2644

Architect

Mundus Bishop Design, Inc.
Pat Mundus
(303) 477-5244
2601 Blake St. #300
Denver CO 80205

Contract Amount
$1,813,310.00

Completion
12/01/2017

Three park playgrounds and trails will be upgraded in this contract, Arapahoe Ridge, Howard Heuston and Tantra Parks. Each park will get a new face lift with new playgrounds, shelters and walkways. Some specialty features are at Arapahoe Ridge Park with a flagstone boulder climbing structure and a new upgraded irrigation system for Tantra.

Project

Sand Creek Park
2700 N Peoria Street
Aurora

Owner

City of Aurora
Ed Shalkey
15151 E. Alameda Pkwy
Aurora CO 80012

Architect

Applied Design Services, LLC
Michael Holweger
Bayou Ridge Trail
Parker CO

Contract Amount
$850,287.00

Completion
10/15/2017

A brand new park for the citizens of Aurora emphasizes on unique play structures for all ages. Flagstone boulders are used for some great climbing activities and large playgrounds and open spaces are designed for very active play. Shelters, picnic tables and benches will keep the parents cool while both concrete and crusher fine paths will connect to the other bike and pedestrian trails. New landscape and irrigation will enhance this enjoyable space.

Project

University Hill Event Street
Pennyslvania btwn 12th & 13th
Boulder

Owner

City of Boulder
Jason Fell
(303) 441-3266
1739 Broadway, 2nd Floor
Boulder CO 80306

Architect

Russell+Mills Studios
Paul Mills
(970) 484-8855
141 S. College Ave. #104
Ft.Collins CO 80524

Contract Amount
$830,884.00

Completion
09/01/2017

This exciting renovation to this small commercial area will remove the entire street and sidewalk from building to building. A new concrete street and curb and gutter will be enhanced by a new 2 tiered sidewalk using stairs and custom concrete block seats to separate the space. In between will be new landscape planters and new lighting will complete this fresh look.

Project

CU SEEC-SEEL Landscape
4001 Discovery Drive
Boulder

Owner

University of Colorado, Boulder
Richelle Reilly
Dept. of Facilities Management
Boulder CO 80309

Architect

Civitas
Craig Vickers
(303) 571-0053
1200 Bannock Street
Denver CO 80204

Contract Amount
$813,280.00

Completion
09/01/2017

This brand new building show cases CU's commitment to energy research and new landscape and irrigation was needed to show case the building. Thousands of native grasses will be planted for sustainability and a water conserving irrigation system will be installed. Improvements to the outdoor areas in the courtyards for student enjoyment will be enhanced and new bike pads installed for student use.

Project

Toll Gate Creek Trail
Iliff to Hampden
Aurora

Owner

City of Aurora
Trent Woolley
(303) 739-7174
15151 E Alameda Pkwy
Aurora, CO 80012

Architect

City of Aurora
Trent Woolley
(303) 739-7174
15151 E Alameda Pkwy
Aurora, CO 80012

Contract Amount
$1,168,298

Completion
08/15/2017

1 1/2 miles of existing asphalt trail is to be replaced with new concrete trail along this heavily traveled bike and pedestrian path. To accommodate the traveler's better adjustment to the grades using multiple concrete walls were used and new connections to the existing park along the route helped improve this corridor.

Project

Pearl Place
Project No. 35487
30th and Pearl Pl
Boulder

Owner

Saunders Construction
Eric Gruber
(720) 417-1321
695 S Jordan Rd
Centennial, CO 80112

Architect

Tryba Architects
1620 Logan Street
Denver, CO 80203

Contract Amount
$1,406,959.00

Completion
08/01/2017

Working with Saunders Construction, GoodLand was subcontracted to complete all the concrete work for the new Google Headquarters. Besides all the site concrete including standard sidewalk and curb and gutter we will be installing specialty sand textured concrete and detailed planters and ramps. To add a challenge we will tackle the slough walls along the creek. 12 ft. high concrete walls with a concrete floor will be used to realign the drainage way.

Project

Weir Gulch Culvert
Hooker St and W 3rd Ave
Denver

Owner

City and County of Denver
Kim Blair
(720) 865-3141
201 W Colfax Ave
Denver, CO 80202

Architect

Felsburg, Holt, Ullevig
(303) 721-1440
6300 S Syracuse Way #600
Centennial, CO 80111

Contract Amount
$495,927.88

Completion
06/01/17

This 150 feet long existing three celled culvert contained an existing 9 ft. by 12 ft. CMP Pipe that was sandwiched between two concrete box culverts. This project was to remove that pipe and install a new concrete box culvert in its place. The unknown is how to chip out the concrete surrounding the CMP pipe without damaging the two existing box culverts.

Project

Aurora Rail Line Access
5 Locations
Aurora

Owner

City of Aurora
Jana Krell
(303) 739-7640
15151 E. Alameda Parkway
Aurora, CO 80012

Architect

Kimley Horn
(303) 228-2300
4582 S Ulster St
Denver, CO 80237

Contract Amount
$2,315,607.12

Completion
05/15/2017

With the new expansion of the Light Rail system to Aurora,roadway, sidewalk and traffic improvements need to be completed for better access to the new Rail Stations. Enhancements to five areas include new and modified sidewalks, improvements to turn lanes and traffic signals, and a new pedestrian access to the I-225 & Florida Ave. bridge.

Project

Turnberry Park
Project No. 36494
10725 Wheeling St
Commerce City

Owner

City of Commerce City
Tony Jaramillo
(303) 289-8166
8602 Rosemary Street
Commerce City, CO 80022

Architect

DHM Design Corporation
Matthew Whipple
(303) 892-5566 900
S. Broadway, #300
Denver, CO 80209

Contract Amount
$1,660,581

Completion
08/01/16

This new 10 acre park is a new addition in the Commerce City system displays wide open play areas with a detailed playground and gathering space. New concrete sidewalks transverse the park and meet in the middle to new shelters, unique play areas and beautiful landscape beds. All and all an enjoyable space for the surrounding residences.

Project

Ruby Hill Bike Park
14000 W Jewell

Denver

Owner

City & City of Denver
Kent Sondergath
(303) 913-0636
Parks & Recreation
201 W. Colfax Ave Dept 613

Architect

Russell+Mills Studios
Paul Mills
(970) 484-8855
141 S. College Ave. #104
Ft. Collins, CO 80524

Contract Amount
$2,321,812

Completion
07/15/16

Request for Qualifications was advertised to select a General Contractor to build this unique Bike Park. Three teams were selected and the team of GoodLand Construction and Alpine Bike Parks was awarded the project. A challenging and creative process this 3 acre site will be transformed into a high flying, dirt bike racing experience. A combination of both dirt and wooden ramps are to be installed between slope style and natural trails, berms and drops. This park will surely be a major attraction in the Denver Park system.

Project

112th Av Corridor
112th Ave from Washington To York St
Northglenn

Owner

City of Northglenn
Greg Yanker
(303) 450-8780
11701 Community Center
Drive Northglenn, CO 80233

Architect

Bowman Vision Land Colorado
Brad Disner
(303) 674-7355
603 Park Point Dr. #100
Golden, CO 80401

Contract Amount
$4,825,428

Completion
07/01/16

One mile of complete road renovation will take place along 112th starting with a new 12" and 16" waterlines and finishing with new landscape. In between GoodLand will remove the entire road in phases so two lanes of traffic remain open and install new curb & gutter, sidewalks, and new traffic signals. Additional drainage improvements will take place modifying the exiting storm pipe and adding a new 4 ft. x 6 ft. box culvert so a new concrete and landscaped plaza can be built on top bridging the residential areas to the commercial. All and all an exciting redevelopment.

Project

Del Mar Park
12000 E. 6th Ave
Aurora

Owner

City of Aurora
Trent Woolley (303) 739-7174
15151 Alameda Pkwy
Aurora, CO 80012

Architect

Mundus Bishop Design, Inc.
Pat Mundus (303) 477-52244
2601 Blak St. #300
Denver, CO 80205

Contract Amount
$2,730,113.00

Completion
05/01/15

Bringing new life to this existing 13 acre park and recreation center a complete renovation is designed. Starting with the existing 90,000 sq ft parking lot, new asphalt wraps new landscape islands. Utility modifications and new storm water lines are added to improve the existing drainage. Then new shelters and restrooms surround a new playground. Connecting these elements are new concrete sidewalks, curb & gutter, crusher fine path and finishing with new landscape and irrigation.

Project

Regency Athletic Complex
1600 W Colfax Ave
Denver

Owner

Saunders Construction
Tony Rueter
(303) 598-0859
6950 S. Jordan Rd.
Centennial, CO 80112

Architect

Davis Partnership
(303) 861-8555
2301 Blake St. #100
Denver, CO 80205

Contract Amount
$1,617,737

Completion
03/01/15

For the final build out of this exiting athletic complex GoodLand is working with Saunders Construction and Metro State to complete all the concrete on this amazing project. Due to the multiple level plaza numerous concrete steps, walls and curbing will need to be installed. The Soccer and Baseball field seating will be all concrete as well as the custom cast-in-place dugouts. Then sidewalks with special scoring and vehicle access roads finish this extraordinary project.

Project

Toll Gate Creek Bridge & Trail
Chambers & Mississippi
Aurora

Owner

City of Aurora
Doug Hintzman
(303) 739-7147
15151 E. Alameda Parkway
Aurora, CO 80012

Architect

SAME

Contract Amount
$1,150,829

Completion
08/01/14

To continue Aurora's extensive trail system a new connection will be made through the Toll Creek corridor. One mile of a concrete trail will be installed through the existing residential area to Toll Creek where a 220 LF bridge was built to connect to the other side. Using a concrete center pier in the middle of Toll Creek extensive dewatering and shoring was necessary to get this 54" caisson out of the ground. To add to this difficult project an "Air Bridge" had to be designed and built over two gas lines so that the concrete trucks, crane and bridge transport does not do any damage.

Project

McCaslin Underpass
McCaslin, North of Washington
Louisville

Owner

City of Louisville
Diana Trettin
(303) 335-4603
749 Main Street
Louise, CO 80027

Architect

Loris & Associated
Scott Belonger
(303) 444-2073
818 W South Boulder Rd #200
Louisville, CO 80027

Contract Amount
$1,362,531

Completion
07/01/14

To improve the safety and traffic flow of the bikers and pedestrians in this well used recreation area a 10 ft. by 12 ft. concrete box culvert is used to bring people under the road. New trail connections are designed and improvements to the existing dog park was completed. To accommodate these new changes a new parking lot was built.

Project

120th & Colorado Blvd.
120th St. & Colorado Blvd.
Thorton

Owner

City of Thornton
Joe DeRenzo
(303) 947-5273
12450 Washington St.
Thornton, CO 80241

Architect

Muller Engineering CO. Inc.
Chris Kroeger
(303) 988-4939
777 S. Wadsworth Blvd.
Ste 4-100
Lakewood, CO 80226

Contract Amount
$1,427,921

Completion
06/01/14

Improving traffic flow at Colorado Blvd. & 120th St. the entire intersection was widened to accommodate new turn lanes. All existing traffic lights, utilities, perimeter concrete and landscape was modified or replaced with new. Due to the space constraints a 6 ft. high wall was built on one side to add a new turn lane. Extensive traffic control and coordination was necessary during this challenging project.

760 Nile Street
Golden, CO 80401

303.278.8100