North-South Bikeway Improvements


Owner:
University of Colorado at Boulder


Location
:
Regent Dr. & Kittredge Loop Ct., Boulder

Contract Amount
: $1,686,043

 

To alleviate the congestion between vehicles and bikers a fly over was designed to bring the bikers underneath. 42 cassions and 610 cubic yards of structure concrete were poured to elevate the roadway so that a tunnel could be put in place. The roadway was then asphalted and the concrete walls faced with 5,000 face feet of veneer flagstone. Lighting top off the pillars and inside the tunnel, concrete sidewalk connected the existing bikeway and then everything was wrapped in new landscape.

McCaslin Underpass


Owner:
City of Louisville


Location
:
McCaslin Blvd. & Washington Ave., Louisville

Contract Amount
: $1,292,000

 

To improve the safety and traffic flow of the bikers and pedestrians in this well used recreation area a 10 ft. by 12 ft. concrete box culvert is used to bring people under the road. New trail connections are designed and improvements to the existing dog park was completed. To accommodate these new changes a new parking lot is built.

Highland Ranch Intersection


Owner:
Highland Ranch Dist


Location
:
Highland Ranch Pkwy & Wildcat Reserve Pkwy, Highland Ranch

Contract Amount
: $217,874

 

To improve traffic flow on this busy intersection a new turn lane was installed. To accommodate this lane a concrete wall was needed as the finished grades pushed back into the existing hillside. To give this structural wall more detail a modular block formliner was used with a concrete stain so as to match the existing walls in the area.

287 Retaining Wall


Owner:
City of Longmont


Location
:
Hwy 287 & Pike Rd., Longmont

Contract Amount
: $358,756

 

The first phase of this roadway improvement project makes way for new landscaping along Highway 287. To build the framework 2,000 CY of earthwork is excavated for a two tier modular block wall terrace. To accommodate this terracing utilities had to be modified and existing pavement repaired. Then a new concrete sidewalk will connect Pike Road to Quebec Ave.